You're standing on a finished slab, the inspector's date is on the calendar, and the one thing you don't have is gas. That's the gap a temporary supply is meant to close, but only if pressure, placement, and approvals line up before a trailer rolls...
You're standing on a cold jobsite with a deadline that won't move. The generator has to be ready before the next freeze, the temporary gas package has to keep a building occupied, and the concrete crew can't afford a temperature excursion that cracks a...
If you're waiting on a gas meter, dealing with a utility outage, or trying to keep a building warm enough to protect finishes and plumbing, heat stops being a comfort issue and becomes an operations issue. Crews slow down. Materials don't cure or dry the way...