A lot of generator decisions get made too late. The building is nearly ready. The electrical gear is in. Controls are being checked. Inspectors are coming. Then someone asks a simple question that should have been settled months earlier: is live gas available at the...
A job can be 95% done and still be dead in the water. That usually happens when the building is ready, the equipment is installed, the schedule is tight, and the permanent gas service still isn’t live. The utility trench may be delayed. Permitting may be dragging. A...