You're standing on a job where the structure is closed in, the trades have moved on, and the last thing between you and occupancy is a final inspection that should've been routine. Then someone discovers a rough-in sign-off never made it into the file, or...
The call usually comes at the worst point in the schedule. The utility tie-in has slipped. The building is close to turnover. Startup crews are lined up, inspectors are asking questions, and every day without fuel pushes another task off the board. At that point,...
You're usually not worried about gas service until the week it doesn't show up. The project is moving. Inspections are lined up. Equipment is on site. The owner wants a date. Then the permanent gas connection slips, or a utility outage hits, or a crew...
A job can be fully built on paper and still sit dead in the field because gas isn't available when the schedule says it should be. Crews are ready. Inspectors are lined up. Startup checklists are sitting in a trailer. Then the permanent utility connection slips,...
Projects usually don't stall because the building isn't ready. They stall because one utility connection isn't. The slab is poured. Equipment is scheduled. Inspectors are lined up. Then the gas meter set date moves, and suddenly the occupancy target,...